PROJECTS HIGHLIGHTS


Al Zaqura Palace (Iraqi Prime Minister’s Office)

The Scope

Within the International Green Zone, the Prime Minister’s Office required modernising internally in all aspects. The plumbing and drainage was refurbished to improve the water systems, while the electrics and lighting were totally overhauled and re-installed. As befits an office of this stature, new and technologically advanced security systems were installed as well as a new fire system throughout the building. To compliment the internal refurbishing, a refresh of its external structure and façade was also deemed necessary.

The Client: Prime Minister’s Office